About This Project

Contract Sum: $1.5m        Client: Tenix/ United Energy        Consultants: Power System Design

Description:

 

Multiworks Services engaged in the refurbishment of the Mentone Zone Substation at the beginning of April 2012. Despite inclement weather for a notable period of time, all major works where completed on time, within budget, and to the desired quality standards. The scope of works included:

  • Construction of a 22kV Control Room
  • Major upgrades to existing site buildings
  • Construction of a 220kV transformer enclosure
  • Significant installation of conduit runs
  • Installation of an environmental drainage system