Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/1267421.cloudwaysapps.com/hbhctqpqww/public_html/wp-includes/functions.php on line 6114
Malvern Substation | Multiworks Malvern Substation | Multiworks
Construction of the Sandringham Substation was to assist in the removal of level crossings over the next eight years, improving safety and enabling more frequent train services.The scope of services included;
  • Undertrack bore, Pits, Trenches & Conduits.
  • Foundations for building & overhead structures
  • Transformer yard – foundations, block work and access gates
  • Security fencing & Access Gates – substation as well as overhead structures
  • Architectural feature for the building (Mod-wood)
  • Installation of overhead structures,
  • Earth electrodes including conduits and bentonite
  • Storm water and Drainage
  • Substation Asphalt.
  • Demolition of Tie Station and removal of debris.
Location

Malvern, Victoria

Client

Beon Energy Solutions/ Metro Trains

Completion

2019

Sector

Rail & Transport